Engineered Wastewater Solutions For Commercial And Industrial Sites

Effective and efficient wastewater management is critical for operational continuity, environmental protection, and regulatory compliance. Emyjor Services provides comprehensive support for commercial and industrial operations in Perth, backed by ISO-accredited systems and 15+ years in business. Our capabilities include:

  • Anaerobic treatment unit installation
  • Wash pads
  • Septic system installation 
  • Pump systems 
  • Integrated water treatment infrastructure

We tailor each system to site conditions and operational demand, ensuring reliability and ongoing compliance.

Safe and Sustainable Wastewater Treatment

Emyjor Services manages the full lifecycle of wastewater treatment projects, from planning and authority coordination through to commissioning and maintenance programs. We operate under ISO-certified management systems, ensuring safety at every stage – for people, the environment, and infrastructure.

We are familiar and work closely with local government and DOH and our team has also been recognised for demonstrating the highest standards of sustainable plumbing practices. For you, that means peace of mind that you’ve made the safe and sustainable call by choosing Emyjor Services.

OUR PROCESS

We follow a structured, safety-led approach to wastewater treatment plant delivery. Our priority is to deliver a reliable and efficient solution.

01

Consultation & Scope

Assessing site conditions and defining discharge requirements and compliance obligations.

02

Design & Approvals

Developing compliant system designs and coordinating authority approvals.

03

Installation & Infrastructure Works

Excavating, placing tanks, and connecting the system, ready for commissioning.

04

Commissioning & Performance Testing

Verifying system performance against specified treatment standards.

05

Ongoing Maintenance & Monitoring

Designing a servicing program to protect long-term reliability.

FAQS

Find answers to commercial plumbing questions, plus information about anaerobic treatment unit installation, septic system installation in WA, and wastewater treatment plant compliance.

Anaerobic treatment unit installation involves:

  • System design
  • Excavation
  • Tank placement
  • Pipework connection
  • Commissioning
  • Performance verification

These systems are common in commercial sites where centralised sewer connections are not available.

Our team ensures each installation meets operational requirements, environmental standards, and local regulations. We manage the entire process from planning to commissioning under ISO-certified systems. We also provide integrated hydraulic design services for commercial operations.

Yes. We manage septic system installation in WA from site assessment and authority coordination through to excavation, installation, and commissioning. Plus, we create structured maintenance programs for long-term reliability.

As a full-service commercial plumbing company, we have the knowledge and equipment to meet compliance, performance, and environmental requirements.

Emyjor Services delivers commercial and industrial infrastructure services across the entire Perth metropolitan area from our office in Wangara. Our teams are trained and experienced to comply with site-specific safety requirements, including offices, schools, shopping centres, and industrial facilities.

We also service the Goldfields and regional WA from our Kalgoorlie HQ, including remote industrial locations and mining operations.

Yes. All wastewater treatment plants installed by Emyjor are approved and engineered to be installed in Western Australian Conditions. Emyjor Services operates under ISO 9001 (Quality), ISO 14001 (Environmental) and ISO 45001 (Occupational Health and Safety) management systems. These certifications support consistent, compliant delivery across all commercial and industrial plumbing projects.

Yes. We work with facilities managers to design tailored preventative maintenance programs. As a full-service commercial plumbing company with an extensive equipment fleet, Emyjor Services is a reliable long-term partner.

OUR PROJECTS

Emyjor Services has delivered wastewater treatment plants, anaerobic treatment unit installation and septic system installation in WA for over 15 years. See how we’ve supported commercial developments, industrial facilities, and remote infrastructure projects.

Castle Hill 250-Person Workforce Accommodation Camp

Castle Hill
Emyjor Services delivered a comprehensive plumbing infrastructure package for the Castle Hill 250-person workforce accommodation camp.

2500 Square Metre Warehouse Build with Wash Pad

Pinjarra

This project involved the hydraulic services installation for a 2,500sqm warehouse development, including a purpose built wash pad facility. A key component of the

Yarri Road 300-Person Workforce Accommodation Camp

Goldfields

This project involved the delivery of complete hydraulic services for a 300-person workers’ accommodation village in the Goldfields region of Western Australia. The scope

Reliable and Sustainable Wastewater Solutions

HEAR FROM OUR CLIENTS

OUR BLOG

Explore practical insights from our commercial plumbing team, including project highlights, infrastructure planning advice, and cost-saving maintenance strategies.

GET IN TOUCH WITH US

Contact Emyjor Services’ award-winning client services team to discuss your operational requirements.

Get in Touch

Name(Required)